Energy Storage That Works Where the Grid Doesn’t
Containerized telecom power, C&I battery cabinets and residential storage — engineered for weak grids, frequent outages and off-grid sites. CE certified. OEM/ODM available.

Four product lines. One supplier.
From a single wall-mounted battery to a 5 MWh container.
ResidentialHome backup that pays back
Stacked 5–30 kWh batteries and all-in-one units for solar self-consumption.
Explore →
C&ICommercial peak shaving
215 kWh cabinets up to MW-scale containers for factories and microgrids.
Explore →
TelecomPower where the grid stops
Solar-hybrid containers and DC cabinets for off-grid base stations.
Explore →
ContainerUtility-scale BESS
3.44 MWh and 5.01 MWh containerised systems, ready to interconnect.
Explore →CE · IEC 62619 · UN38.3 · RoHS | 20+ Years Manufacturing Heritage | Deployed in 20+ Countries
Start From Your Site, Not From a Datasheet
Telecom Site Power
Diesel-dependent BTS sites are the largest opex line for African and Middle East operators. Our solar-hybrid containers cut fuel consumption by up to 70% with unmanned, remotely monitored operation.
Explore Telecom Solutions →
Weak Grid & Load Shedding
For homes and small businesses in markets where the grid drops daily. 10 ms transfer, pure sine wave, 6–12 kW output, 8000-cycle LFP.
Explore Backup Solutions →
Off-Grid Farm & Island
Irrigation pumps, cold storage, remote lodges, island microgrids. Parallel up to 12 inverters with a single communication cable.
Explore Off-Grid Solutions →
Battery Retrofit
Replace aging lead-acid or first-generation LFP banks without touching the grid connection or the existing inverter.
Explore Retrofit Solutions →
Four Product Lines, One Specification
| Line | What you get | Typical buyer |
|---|---|---|
| Residential ESS | 5.12–34.3 kWh stackable and cabinet systems, 6000–8000 cycles, 6–12 kW hybrid inverter integrated | Installers, distributors |
| C&I Storage | 50 kW/115 kWh to 100 kW/215 kWh outdoor cabinets; 40 kW/92.3 kWh off-grid integrated cabinet | EPCs, factory owners |
| Container Storage | 3.44 MWh and 5.01 MWh liquid-cooled 20 ft containers | Developers, IPPs, utilities |
| Telecom Site Power | 10/20 ft solar-hybrid containers and 40U outdoor cabinets, −40 to +50 °C, IP55 | Operators, tower companies |
Built to Our Specification, Released Against Our Test Protocol
We write the bill of materials, the process specification and the acceptance criteria. Production runs at qualified partner factories, and no unit leaves without a factory acceptance test against that protocol. The test report travels with the goods, serial number by serial number.
- Certification you can verify. Every SKU ships with CE, IEC 62619, UN38.3 and MSDS documentation. Certificate numbers are provided for independent verification.
- One specification, four lines. Residential, C&I, container and telecom are built to the same process specification and pass the same QA gates. The factory changes with the product; the specification does not.
- OEM from 1 × 20 ft container. Your logo, your manual, your packaging. MOQ starts at one container for residential lines.
- Engineering, not just quoting. We size the array, the battery and the generator for your load profile before we send a price.
Certified, Documented, and Clear About the Details
Every unit ships CE marked (LVD, EMC, RoHS) with IEC 62619, UN38.3 and MSDS documentation, so it can be sold and installed legally across the EU and UK.
Where a project needs a national grid-code certificate — EN 50549, VDE-AR-N 4105, G99, CEI 0-21 — we confirm the certificate package for your country before we quote, and we tell you in writing which route gets your site commissioned fastest.
Most of our volume goes into off-grid, backup, weak-grid, telecom and behind-the-meter sites, where CE plus IEC 62619 is exactly what the authority having jurisdiction asks for.
Technical Notes
How we size systems, what the standards actually require, and where the numbers come from. Written from site experience, not from datasheets.
- What Size Battery Cabinet Does a Factory Actually Need? — three numbers decide it, and none of them is annual kWh.
- Diesel vs Solar-Hybrid at an Off-Grid Telecom Site — fuel is only 40% of what a diesel site costs over ten years.
- Lead-Acid to Lithium: What Actually Changes on Site — the charger, not the battery, decides whether the retrofit works.
- The Five Documents That Decide Whether a Battery Container Clears Customs — missing one stops the shipment, not slows it.
Send Us Your Load Profile
Tell us: site country, daily kWh consumption, peak kW, hours of autonomy required, and whether grid export is needed. We will return a sizing sheet and a budget price within two business days.
